Louisiana state seal Louisiana Ethics Administration Program
Home Opinions Search EAB Decisions Search
26. <br /> Within the last four years,the Parish paid Clarence Savoie,II,through Savoie Engineers, a <br /> total of $54,913.25 for services rendered on the Lions Water Treatment Plant Ultraviolet <br /> Disinfection Project. <br /> 27. <br /> Additionally, Clarence Savoie,II,rendered services,through Savoie Engineers,pursuant to <br /> the Parish Engineer Contract, in connection with the Lions Water Treatment Plant Ultraviolet <br /> Disinfection Project, as reflected in the invoices submitted to the Parish. <br /> 28. <br /> On February 3, 2015, Clarence Savoie, II, on behalf of Savoie Engineers, entered into a <br /> contract with the Parish whereby he agreed to provide professional engineering services, through <br /> Savoie Engineers, on the Elevation of Electrical Components for which the Parish agreed to pay a <br /> lump sum fee of$259,098.16. <br /> 29. <br /> Within the last four years,the Parish paid Clarence Savoie,II,through Savoie Engineers,a <br /> total of$178,741.80 for services rendered on the Elevation of Electrical Components project. <br /> 30. <br /> Additionally,Clarence Savoie,II,rendered services,through Savoie Engineers,pursuant to <br /> the Parish Engineer Contract,in connection with the Elevation of Electrical Components project, <br /> as reflected in the invoices submitted to the Parish.. <br /> Page 7-of 11 <br />